W1siziisimnvbxbpbgvkx3rozw1lx2fzc2v0cy9tb3jzb24vanbnl2jhbm5lci1kzwzhdwx0ltmuanbnil1d

Home

Process Performance Engineer

  • Location

    Chester, Cheshire

  • Sector:

    Aerospace Manufacturing

  • Job type:

    Contract

  • Salary:

    Up to £27.00 per hour

  • Contact:

    Joanne Edwards

  • Contact email:

    Joanne.Edwards@morson.com

  • Job ref:

    170935JE_1574863941

  • Published:

    9 days ago

  • Duration:

    4 Months+

  • Expiry date:

    2019-12-04

  • Start date:

    Jan 2020

  • Client:

    #

Our Broughton Client has a requirement for a Process Performance Engineer to undertake the below contract role.


Missions and activities

* Ensure the creation of the best industrial sequence, in the definition phase, through early integration of SLB optimisation drivers (PERT, constraints).
* Enable the best industrial sequence execution to secure delivery within takt with optimised level of resources (SLB deployment, LB release per MSN).
* Ensure continuous monitoring and improvement of manufacturing efficiency (CVAT)
* Set-up Line Balancing as mandatory pre-requisite for Manufacturing process/sequencing definition and Manufacturing performance monitoring from conception to industrial phase (early PERT/STV)
* Drive Line efficiency with continuous improvement of Line Balancing (right granularity/time referential, white/red space optimisation)
* Support process optimisation, maximizing Value Added with priority on critical path. Key input are: * Release Routing * Industrial Architecture Dossier (Product build concept, industrial planning, requirements regarding industrial performances) * V &V plan (Product Lifecycle Management )
* Identify technical constraints on assembly sequences, with the support of the SPE
* Create and deploy SLB (reference CN)
* Release Line Balancing per MSN
* Create White Space reduction action plan and Red Space analysis maximizing CVAT efficiency (in the frame of Continuous improvement of SLB through efficiency loss reduction)
* Identify Critical path and maximize station capacity (frame of continuous improvement)
* Identify and share best practices across stations/CDTs/Plants/FALs
* Maintain/develop transvers new methods and tools around STV/SLB
* Update and maintain Transverse STV TiCon Database * Improve Costs * PERT Chart * Standard Line Balancing
* Create and maintain PERT Chart * Create and maintain Standard Line Balancing (SLB) and thus enable Production Pace Control (PPC)
* Monitor Manufacturing performance and propose improvements based on analysis of gap
* Reduce Efficiency Loss via white space/red space identification, analysis and reduction
* Improve Process and Serial Allocated time via VA/NVA analysis and shop floor process observation In addition, applicable to transverse/central PPE
* Maintain STV database up to date (incl. NC process)
* Check STV golden rules adherence * Define/update Method/Process/AOS bricks related to STV/SLB
* Define/maintain Digital tool for STV/SLB * Ensure right level of competences of users/stakeholders on STV/SLB : Coach assess end user in the STV /SLB usage
* Support the Industrial Architect for industrial set up evolution analysis. For more details refer to Airbus commercial procedure referential A2019.1 Produce Routings, As-Prepared Bill Of Material and Standard Operating Instruction